Bluebeam Revu => Revu General Topics => Topic started by: Jim H on May 15, 2019, 08:24:27 AM

Title: Drawing Log Date format
Post by: Jim H on May 15, 2019, 08:24:27 AM
When exporting a drawing log to excel, the default title is Drawing Log [Date] which produces an excel filename of Drawing Log 5-15-2019.xls
Is there a way to change the format to produce a filename of Drawing Log 2019-05-15.xls
That is, how can I change the [Date] argument to produce yyyy-mm-dd formatted filename?
Title: Re: Drawing Log Date format
Post by: Steve on May 15, 2019, 08:54:20 AM
I do not believe that is possible - at least I can find no way to change it.  The same limitation seems to exist in the user of [DATE] in creating a custom stamp.